Service
Oil & Gas PDF Brochure
Jord’s offshore experience ranges from complete topsides, to modular delivery of process systems to supply of individual capital equipment
Jord’s scope of supply here was the design and supply of 600 tons of Balance of Plant surrounding two Siemens gas compressors.
This module treated fuel gas required for a power generation module on a FPSO located off the coast of Mumbai, India.
Jord offers a range of hydrocarbon separation and treatment technology, be it solids and liquids from gases or the separation of liquids of differing densities.
Jord delivered its first air cooled heat exchanger to the Oil & Gas industry way back in 1977.
Jord delivered the below 30 m3/hr condensate treatment module to Bumi Armada for an Indian FPSO.
In collaboration with Siemens, Jord delivered a 220 ton per day sulphate treatment system for an Angolan offshore production platform.
The below produced water treatment system for an Indonesian FPSO separates condensate/oil from produced water down to 50 mg/l.
follow us
login