The accompanying image shows a few of Jord Malaysia’s workshop crew, celebrating the successful Factory Acceptance Test of gas compressor air cooled heat exchangers. The air coolers are to be delivered to a XTO (Exxon) gas field in the Permean Basin of New Mexico. COVID prevented our American friends witnessing the test in Malaysia. However, they were on-hand over Zoom and together with 3rd Party Inspectors, signed off successful completion of all required test work. There were 15 air cooler bays in total. Three of them can be seen in the background of the photo. The air cooler train was way too big to undertake this work under roof in Jord’s workshop. So cranes were hired in to assemble and test the train in a holding bay outside the workshop.

Other News
Century makers
Four more names have been etched into Jord’s 10 year service honour board. This brings the total of men and women, past and present, who have worked more than 10 years at Jord to over 100.
Ganesh Chaturthi
We’re an agnostic company, supportive of and curious about all peace-loving beliefs, religions and ideas.