The accompanying image shows a few of Jord Malaysia’s workshop crew, celebrating the successful Factory Acceptance Test of gas compressor air cooled heat exchangers. The air coolers are to be delivered to a XTO (Exxon) gas field in the Permean Basin of New Mexico. COVID prevented our American friends witnessing the test in Malaysia. However, they were on-hand over Zoom and together with 3rd Party Inspectors, signed off successful completion of all required test work. There were 15 air cooler bays in total. Three of them can be seen in the background of the photo. The air cooler train was way too big to undertake this work under roof in Jord’s workshop. So cranes were hired in to assemble and test the train in a holding bay outside the workshop.